Customs duty on Others welded, of non-circular cross-section pipe in Nepal

Others welded, of non-circular cross-section pipe is classified under HS code 7306.90.90 (chapter 73, Articles of iron and steel). It attracts 30% customs duty (general), plus 13% VAT on the CIF value and duty.

30%General duty
30%India & SAARC (SAFTA)
13%VAT
kgCustoms unit

Landed cost — worked example

For a shipment with a CIF value of Rs 100,000 (cost + insurance + freight to the Nepal border), the customs duty and VAT work out as:

OriginCustoms dutyDuty amountVAT (13%)Landed cost
General (any origin)30%Rs 30,000Rs 16,900Rs 146,900

Excise duty, the road-development fee and other charges apply to specific goods (vehicles, alcohol, tobacco, petroleum…) and are not in the figure above. Open the full calculator →

Nepal’s imports of Others welded, of non-circular cross-section pipe

Nepal imported about Rs 3.18 Arab of Others welded, of non-circular cross-section pipe in FY 2082/83, mainly from China, India, Korea, Republic of.

Source countryImport value (FY 2082/83)
ChinaRs 29.82 Crore
IndiaRs 11.10 Crore
Korea, Republic ofRs 37,000
AustriaRs 1,000
QatarRs 1,000

Related products

Ductile Iron pipeHS 7306.90.10 · 30% dutyTanks, casks, drums (excl for gas) of iron or steel, <50 lHS 7310.29.00 · 15% dutyStructures and parts of structures, nes, o iron or steelHS 7308.90.00 · 20% dutyTowers and lattice masts of iron or steelHS 7308.20.00 · 20% dutyParts of appliances of 732111 to 732189, o iron or steelHS 7321.90.00 · 5% dutyIron/steel tubes, riveted, >4064mm extern a diameterHS 7305.90.00 · 20% dutyStranded wire, cables of iron or steel, no electically insulatedHS 7312.10.00 · 30% dutyIron/steel line pipe, spirally welded, ci cular x-section,>4064mm ext diamHS 7305.19.00 · 20% duty
Full landed-cost calculatorOpen 7306.90.90 in the tariffChapter 73